To maximise industry adoption of the recent code change that, from May 1st 2016, will allow timber framing and massive timber in specified mid-rise buildings, a specifier information program has been developed.
Over thirty CPD workshops will be delivered under the WoodSolutions’ brand, in tandem with many of the same stakeholders involved in the Code change process. These include the Australian Institute of Building Surveyors (AIBS), the Australian Institute of Architects (AIA), Building Designers Australia (BDA), the Building Designers Association of Victoria (BDAV), Master Builders Association (MBA) and fire engineers through Engineers Australia.