• Tags

  • Resource Type

1 result(s) from "" Search
  • FWPA
  • Report

The aim of this project was to obtain real data on the temperature, relative humidity, moisture content of timber and vertical displacement of a real, six-storey timber-framed building, du…

  • FWPA
  • Report

This project utilised photogrammetry methods to measure installation productivity of CLT panels in a medium-rise timber building. The analysis of the data indicated that an average floor…

  • FWPA
  • Report

Timber Construction and Building Height Planning Controls – The unintended consequences of the Planning System. For the property development industry, the benefits of using timber build…

  • FWPA
  • Report

This project addressed the potential value that the use of Radio- Frequency Identification Technology (RFID) can add to prefabricated timber construction and to undertake basic developm…