- FWPA
- Report
Industry Consultant Jim Houghton from Hire Thinking has undertaken analysis on the Victorian Building Authority Permit data to make market share comparisons on building material permit d…
Industry Consultant Jim Houghton from Hire Thinking has undertaken analysis on the Victorian Building Authority Permit data to make market share comparisons on building material permit d…
Timber Construction and Building Height Planning Controls – The unintended consequences of the Planning System. For the property development industry, the benefits of using timber build…
The aim of this project was to validate the assumption used within the Australian Standard AS1720.1 for calculating compression perpendicular to grain for common timber species and develo…
This research presents the global warming potential (GWP) from ‘cradle to construction site gate’ for both a hypothetical office building and apartment building, located in New South Wale…
This study compares the life cycle environmental impacts of two multilevel residential buildings built in Australia. The first building (‘Study building’) incorporated an innovative l…
Opportunities for using western red cedar on the exterior of buildings in bushfire-prone areas are limited by the requirements of Australian Standard (AS) 3959 Construction of buildings i…
Presented by Greg Foliente, CSIRO Ecosystem Sciences, Wednesday 5th March, 2014. With the global megatrends and megashocks that are changing the world as a backdrop, examples of how leadin…
These manuals are backing document to the Timber Service Life design guide that is available on WoodSolutions, click here to view. The vision for developing durability design procedures fo…